Stability & CargoPage 1 of 12
Sounding from an ullage: correct it first, then read across
The rule
- The ullage is the empty space above the cargo, measured down from the reference point at the top of the gauging pipe; the sounding is the depth of cargo, measured up from the datum plate on the tank bottom.
- Both hang on one number from the tank tables, the reference height: the distance from the reference point down to the datum plate.
- When she is not on an even keel, apply the trim correction from the tank tables to the ullage you gauged — before you turn it into anything else.
- Sounding = reference height − corrected ullage. As the tank fills, the ullage falls and the sounding rises.
Formula
- Corrected ullage = gauged ullage + trim correction (sign from the tank tables)
- Sounding = reference height − corrected ullage
Worked example
| Tank reference height, ullage datum to the datum plate | 15.15 m |
| Ullage gauged with the portable unit | 6.52 m |
| Trim correction from the tank tables, to be added | 0.08 m |
- Corrected ullage = 6.52 + 0.08 = 6.60 m
- Sounding = 15.15 − 6.60 = 8.55 m
Answer8.55 m
Common mistake
Writing the corrected ullage, 6.60 m, into the sounding column.
Both are believable depths in metres, so nothing on the sheet looks wrong — but one is measured from the top and the other from the bottom: here the cargo stands 8.55 m deep, not 6.60 m, and the tank table will turn the wrong one into the wrong volume.